Body under construction

Body under construction


Tue Dec 12, 2006 2:51 pm
19
dougx75
Teardrop Inspector
 
Posts: 0
Images: 4
Joined: Tue Dec 12, 2006 2:28 pm
Location: N Idaho

Image Description

All 3/4 cabinet grade ply two 4x8 sheets. Frame will be totally enclosed with water tank and under floor storage.It will be like an egg with a smooth bottom.

Return to dougx75