valspar bonding result

valspar bonding result


Sat Jul 04, 2020 10:38 am
574
User avatar
tomhawk
Teardrop Advisor
 
Posts: 92
Images: 99
Joined: Fri Dec 29, 2017 11:51 am
Location: Eastern Iowa

Image Description

After drying for 24 hr, a canvas fragament was again painted with primer and applied to surface in panel B. In panel C, TBII was used instead. After one day of drying the canvas was ripped. back to test bonding of canvas to foam. The binding of TBII to the primer is very poor after 24hr. See next panel for 48hr.

Return to tomhawk