Step 11: Install ceiling 1/8” birch plywood

Here is a generic building plan for a teardrop designed by the members of T&TTT.

Step 11: Install ceiling 1/8” birch plywood

Postby mikeschn » Tue May 10, 2005 1:14 pm

Step 11: Install headliner 1/8” birch plywood

You are going to prefabricate the entire ceiling panel on the floor.

Cut 2 strips of birch plywood to 3” x 58 ½”.

You’ll need 3 pieces of birch plywood.
Piece 1 = 48” x 58 ½
Piece 2 =
Piece 3 =

Set the plywood panels (good side down) on a clean flat surface, so they form 1 large panel, 109” x 58 ½”. Glue the 2 strips of 3” plywood so that they straddle the joints. Place something heavy on the 3” strips and let dry. 1 gallon jugs of water are good for weights.

The next day; this would be a good time to flip the assembly over and stain and polyurethane it. See step 10 for details.

After the headliner panel is finished and dry; Slide the panel in from the rear, above the cabinet assembly and below the spars. Apply glue to the spars, one at a time, and press the ceiling panel into position.

Tack into position with a pneumatic stapler. If you prefer not to see staples on the inside, then prop the ceiling in position with a series of sticks of various lengths wedged into position.

Let dry.
The quality is remembered long after the price is forgotten, so build your teardrop with the best materials...
User avatar
mikeschn
Site Admin
 
Posts: 19202
Images: 479
Joined: Tue Apr 13, 2004 11:01 am
Location: MI

Postby dacrazyrn » Tue Oct 18, 2005 12:22 pm

User avatar
dacrazyrn
Teardrop Master
 
Posts: 284
Images: 74
Joined: Tue Aug 09, 2005 1:35 am
Location: Greeley, CO


Return to Generic Building Plans

Who is online

Users browsing this forum: No registered users and 14 guests