PostPosted: Mon Feb 16, 2009 7:36 pm
by Tx River Rat
I have been getting a little done between the light showers and cool mornings.
Got my finish coat of glass on the roof and about half sanded out, all the rain and no leaks :lol:
Built and installed the inside fenders.
I have about half the framing for windows installed should be finished tomorrow with that.

I changed a few things on the tepee from the measurements we used on the coyote.
On the front profile I used a 12 and 12 (45%0 angle top and bottom, I did this for more room and battery mounting in the future. The back has a 8 inch tall 12 inch foreward slope ,I will get into why later.
On my camper I will be using a 38 inch wide mattress for when I am camping solo and two of them when my rib goes, so I moved the door foreward on the tepee to accommodate that.
The back wall will carry the ac and I also want to build some small cabinets and a tv stand ,so I braced the back wall stronger.
Pics will have to follow tomorrow my batteries went south on my camera.
Ron :?

PostPosted: Tue Feb 17, 2009 10:44 am
by aggie79
Looking good, Ron. :thumbsup:

You're moving a lot faster than I am. We are similar though, in that I will be building the teardrop before I get my trailer. I think that is how Grant Whipp builds his, not that mine will be anything comparable to the quality that Grant does.

PostPosted: Wed Feb 18, 2009 7:48 pm
by Tx River Rat
Aggie
I ran a steel fab shop for a lot of years so the frame is a pretty simple matter for me to build.
It will be easier to jig up and build both of them at once.
Ron

PostPosted: Wed Feb 18, 2009 7:54 pm
by Tx River Rat
Got a little more done and some pics :lol:

I moved the door foreward and cut in and framed
Image

fenders built and installed

Image

Image

windows framed out.

Image

put my saturation coat on the inside walls and back

Image

Image

In the morning I will start cutting foam and installing.
Ron

PostPosted: Wed Feb 18, 2009 10:44 pm
by Texas Coyote
Hey that looks great, Just now logged on to see what you had gotten done your almost up to mine ... Maybe now we can get the frame built if I can ever get some time off. Got to work the next 10 days without a day off. But then its off to Lake Fork for fishing trip...Can't miss that !!!! :D

PostPosted: Wed Feb 18, 2009 10:45 pm
by starleen2
Texas Coyote wrote:Hey that looks great, Just now logged on to see what you had gotten done your almost up to mine ... Maybe now we can get the frame built if I can ever get some time off. Got to work the next 10 days without a day off. But then its off to Lake Fork for fishing trip...Can't miss that !!!! :D


yet another contest?? glad to see both builds going again - can't wait to see em' finished :thumbsup:

PostPosted: Fri Feb 20, 2009 8:49 pm
by Tx River Rat
Got the foam installed today on side and back wall

Image

interier wood put up on side walls


Image


Installed the ribs accros the front

Image

Its ready to close up now.
Ron

PostPosted: Sun Feb 22, 2009 8:52 pm
by Tx River Rat
Had a pretty good day today.

Framed my door.

Image

Insulation installed

Image

Got the rest of the skin put on outside of the tepee

Image

Image

all the framing installed inside

Image

Image

It is ready for a saturation coat of glass on the installed parts tomorrow.
Ron

PostPosted: Tue Feb 24, 2009 9:39 pm
by Tx River Rat
Got the saturation coat on the inside areas this morning ,then cut and finished installing foam.

Image

Got all the inside skin installed

Image

Image

Started filling screw holes and seams on the outside.

Image

More to come tomorrow.
Ron

PostPosted: Tue Feb 24, 2009 9:43 pm
by starleen2
Looking good so far - It's getting closer to camping season - keep up the progress

PostPosted: Tue Feb 24, 2009 10:50 pm
by Tx River Rat
I have a little trip planed at the end of next month. So the tepee needs to be camp able by then. Then when I get back from there I have a multi day kayak trip planned so I have to stay with it.
Ron

PostPosted: Wed Feb 25, 2009 7:49 pm
by Tx River Rat
No pics today .
Got the door fit and ready to hang, most of the screw holes filled and the seams ready to be taped and glassed.
Ron

PostPosted: Sat Feb 28, 2009 5:50 pm
by Tx River Rat
Today was one of those money spending days.
First I found the lock I am going to use for the door,bought it.
I then went and picked up my windows for the tepee ,bought them
Stopped by Academy they had a pop up tent like I wanted for the river float trips I make,bought that
Then my better half had a couple stops to make, Michles, for card stock(she does custom greeting cards) then 2 stops where she bought violets,some where the seeds had been in outerspace, I just said yes dear and paid for them.
Went to Cracker Barrel and ate.
Had to get back to the house was spending to much.
But I am on the better side of the lady of the house
(bet it don't last long) :twisted:
Ron

PostPosted: Sat Feb 28, 2009 7:16 pm
by Cliffmeister2000
Tx River Rat wrote: Had to get back to the house was spending to much.
But I am on the better side of the lady of the house
(bet it don't last long) :twisted:
Ron


You got off easy! I had to buy a dog! :?

PostPosted: Sun Mar 01, 2009 10:07 pm
by Tx River Rat
I had a pretty good day today. Bed is framed out and top installed

Image

It is hinged so you can use the space under it as srorage

Image

Got the window opening routed out and windows installed

Image

Image

Door is hung ready for latch.

Image

Image

I closed it up and put a small electric heater inside within minutes I was turning it off.
Till tomorrow
Ron