These are the pieces to my front bulkhead. Front wall with cutout for the AC, and behind it the sliding doors for a little cabinet in the headboard.
Dry fit of the front bulhead wall and tounge box, that's where the AC is going. You can also see my wall and door laying on the deck.
My insulated walls.
The weather sure has changed. It's now 55 and raining, and now instead of worrying about dripping sweat on my luan I'm trying to keep the rain off. Everything but the trailer spent two days piled in our kitchen while the thunderstorms ravaged our carport.
I went to McCoy's Lumber to get my 1/8 luan and was told that nobody in the area carries it even though their website says they have it in stock. I'm going with wallboard from Big Orange Box for the inside skins so I can keep working while I wait for my special order of 1/8 ply to come in.
I'm trying to set our first camping trip for the end of November. Wish me luck!