At the shop at 7:30 this morning...
Going to get this deck done today, sun, rain or snow...
. better not snow here in Central Texas..
I hate the snow...
Cut and Installed the second piece of ply, glued really good and clamped.
Let set for two hours. Good and set when I checked it.. Left most clamps on anyway... except where I needed to do the next piece..
Checked frame where the last piece needed to be and we are still square..
Cut, glued and clamped piece on... will be a small seam on this piece, didn't want to cut a whole other sheet...
Just run a 3/4" scab under the seam. it will hold great....
Routed the opening of the drop box out using a flush bit.. looks good.. Still have alumium to do on the outside corners of the box..
Then will lay linoleum in drop box later..Caulk all corners with silicone.
Finish it before I do the linoleum on the decking..
Letting the glue dry on deck section, then will go cut and install that last small piece.. will be ready to flip over tomorrow, with little bro's help
and do aluminum on box corners.
Then cut and glue in all the foam...