Well Sat and Sunday were spent drilling spars and pulling wires for trailer lites and installing the headliner (More white pebbel grain FRP ) I then insulating between the spars. Used ice dam tape to seal in the insulation by taping over the spar and taping the Tuff R foil faced polyisocyanurate board in place. I also ran a run of tape along the top of each wall and rounded over the edge to eliminate water intrusion at the top to side joint.
I will be installing the FRP top as soon as the front bulkhead and the taillight panel is installed.
I will be installing a shear wall in the front of the teardrop to remove all trace of wiggle out of the box. I have the door trim cut from scrap here at work and loaded in the truck ready to install around the single door and window.
I know , I know, pictures pictures pictures .........