So, finally got some time and great weather to get back to working on the camper. Got my interior wood trim pieces made and installed on the wall. Installed the 3/4" sisal rope for trim around the the wall-roof-walls joints. The rope trim idea came up in a thread from last year I think and it works great. Was hard to find it though, but Rural King has it from 1/4"- 1" diameter. I used 1/2"
Opened up the ducting system and will build and install the connection box underneath to attach the AC when needed or just using my 12v fan systems. Changed out the giant, heavy battery converter portion of my RV panel and put in the guts of nice light weight automatic 2/10 amp charger. Hope to have the on-demand hot water heater heating system built next week. Still have a couple of pieces of wood face pieces for the bed support.
After that, I'll remove the existing tongue box system and build the pirate chest. We'll then hopefully do the aluminum rock guard, finish paint and trim cedar on the face and rear areas over the PMF. I'm hoping to have it all complete by the 2nd week of March.
I love working on this thing, nice being retired.
dave